THE PROGRAM
Six roles do the work of designing BramHA. Three gates wait for a person. That is the whole operating model.
SIX ROLES
Each AI Employee has one job and a brief.
- ARCHITECTURE
- Turns what the machine needs into what the chip must do.
- LOGIC DESIGN
- Writes the description of the circuit.
- VERIFICATION
- Tries to break that description before a foundry is asked to make it.
- PHYSICAL DESIGN
- Turns the logic into a layout the process can build.
- FIRMWARE
- Writes the code the chip runs on its first day.
- PROGRAM
- Holds the schedule across the other five, on Tymeline, and says so when it slips.
THREE GATES
The work proposes. A person signs.
AI Employees prepare and propose; a named engineer signs. No specification, design freeze, or tape-out of BramHA is approved by an AI Employee, and every step is on a record Element 31 holds.
01 · SPECIFICATION
What the chip must do.
Signed before any logic is written, so the work has one thing to be checked against.
02 · DESIGN FREEZE
The logic stops changing.
Signed when verification has earned it, so the layout is drawn from something fixed.
03 · TAPE-OUT
The layout goes to the foundry.
Signed last, by a person, because a fabricated chip cannot be patched.
WHERE THE WORK RUNS
On our own appliance, on our own repositories.
The program is being set up so the AI Employees work on a Czar Forge, and the design stays on hardware Element 31 controls.
WHERE IT STANDS
What is not done yet.
BramHA is in development. No chip has been taped out and nothing is for sale. First silicon is targeted for November 2027; that is a target, not a promise.
- SILICON
- No chip has been taped out, and no chip exists.
- SPECIFICATION
- The first design's specification is not published.
- PROCESS
- The process and the foundry have not been announced.
- FIGURES
- There are no performance, power, or price figures.
- CERTIFICATION
- No safety certification is claimed, and none should be inferred.
- ORDERS
- Nothing can be ordered, and there is no partner intake.