Skip to content

IN DEVELOPMENT · NO CHIP HAS BEEN TAPED OUT

E31 BRAMHA · IN DEVELOPMENT

BramHA is the chip on the machine’s side of the link: control, motion, sensing, and identity, on a mature process node and open foundations. First silicon is targeted for November 2027.

WHY A MATURE NODE

A robot needs certainty, not density.

The work that stays on a machine is closing a loop on time and stopping when it must. None of it needs the leading edge of chip manufacturing.

WHAT IT IS BEING DESIGNED TO DO

Four jobs that belong on the machine.

CONTROL

The loop closes on the chip.

A real-time controller, being designed so the machine's own loop never waits on a network.

MOTION

A controller at the joint.

Drive for a motor where the motor is: one part, repeated along the machine.

SENSING

Sensors read where they are.

Position, current, and force, measured beside the motion they describe.

IDENTITY

A machine that can prove what it is.

A hardware root of trust, so a site can check a machine before it is served.

HOW IT IS BUILT

Open foundations. AI Employees. A named engineer at every gate.

OPEN FOUNDATIONS

Open, from the instruction set down.

An open instruction set, open design tools, and open process kits where a foundry publishes one.

Open foundations

AI EMPLOYEES

AI Employees do the engineering.

Architecture, logic, verification, physical design, firmware, and the schedule each have one doing the work.

The program

THE GATE

A named engineer signs.

The specification, the design freeze, and the tape-out each wait for a person. No AI Employee approves a gate.

The three gates

IN THE FAMILY

The Grid thinks for the floor. The machine acts for itself.

Safety, stops and motion stay on the machine as its vendor built them. Czar Grid serves perception, decisions and adaptation over the site's network; it is not a controller and does not sit inside any real-time or safety loop.

BramHA is a part a robot maker may build into a machine. It is not a safety system and carries no certification; safety, stops and motion stay on the machine as its maker built them.

WHERE IT STANDS

What is not done yet.

BramHA is in development. No chip has been taped out and nothing is for sale. First silicon is targeted for November 2027; that is a target, not a promise.

SILICON
No chip has been taped out, and no chip exists.
SPECIFICATION
The first design's specification is not published.
PROCESS
The process and the foundry have not been announced.
FIGURES
There are no performance, power, or price figures.
CERTIFICATION
No safety certification is claimed, and none should be inferred.
DESIGN FILES
Which design files are published, and under which license, is not decided.
ORDERS
Nothing can be ordered, and there is no partner intake.